Utility
This video will give you an overview of how DC functions if one of the MEP hardware fails.
Scenario 1:- Normal Mode
Scenario 2:- Schedule Maintenance (single source)
Scenario 3:- Load on DG (when both the Utility fails )
Note:- Dont use the configuration from design, these are prepared purely from theoretical aspects.